Introduction
China has developed one of the world’s largest municipal solid waste (MSW) incineration sectors over the past three decades. Through infrastructure investment, policy support, domestic technology development and increasingly integrated waste-management systems, the country has expanded the use of incineration to treat residual municipal waste while recovering energy.
The development of waste-to-energy (WtE) in China provides an important case study in how waste-treatment infrastructure evolves alongside urbanization, environmental regulation, energy policy and the transition towards a circular economy.
This profile presents the historical development, available national statistics, regulatory framework and principal technologies of China’s MSW incineration industry, drawing on official Chinese statistical sources and published industry research.
1. China at a glance
By the end of 2025, China’s mainland MSW incineration industry had reached a reported operational capacity of approximately 1.1 million tonnes per day, distributed across 1,146 operational plants monitored by the Ministry of Ecology and Environment (MEE), according to the statistics.
The industry has moved from a limited number of pilot facilities to a nationwide network of large-scale plants. Grate incineration has become the dominant technology, supported by domestic equipment manufacturing, heat recovery, flue-gas treatment and increasingly digitalized plant operations.
Key indicators — reported for the end of 2025
These indicators describe the incineration industry, not the entire municipal waste-management system. Recycling, composting, anaerobic digestion, landfilling and other treatment routes remain relevant to the overall system.
Number of MSW Incineration Plants in China
China’s municipal solid waste (MSW) incineration infrastructure covers both urban areas and county-level areas. According to the China Urban-Rural Construction Statistical Yearbook and its environmental sanitation statistics, the reported figures for 2025 are:
- Urban areas: 733 incineration plants
- County areas: 413 incineration plants
- Total: 1,146 incineration plants
Data source: China Urban-Rural Construction Statistical Yearbook 2025, from Ministry of Housing and Urban-Rural Development (MoHURD), including the tables on urban environmental sanitation and county-seat environmental sanitation (分省县城市容环境卫生).
Historical data
The latest available figures should be presented alongside previous years to illustrate the development of China’s incineration infrastructure. Urban and county data should remain separate wherever the source publications report them separately.
| Year | Urban plants | County Plants | Combined total | Official data sources (MOHURD) |
|---|---|---|---|---|
| 2025 | 733 | 413 | 1,146 | Urban County |
| 2024 | 739 | 390 | 1,129 | Urban County |
| 2023 | 696 | 349 | 1,045 | Urban County |
| 2022 | 648 | 313 | 961 | Urban County |
| 2021 | 583 | 257 | 840 | Urban County |
| 2020 | 463 | 156 | 619 | Urban County |
Automatic Emissions Monitoring and Information Disclosure Platform

China’s Municipal Solid Waste Incineration Power Plant Automatic Monitoring Data Disclosure Platform provides public access to environmental
monitoring data from municipal solid waste incineration power plants across China. Established in 2020, the platform supports environmental transparency and public oversight by disclosing daily average emissions of five air pollutants: particulate matter (PM), nitrogen oxides (NOₓ), sulfur dioxide (SO₂), carbon monoxide (CO), and hydrogen chloride (HCl). It also provides furnace temperature curves and relevant data flags.
The platform operates within China’s environmental information disclosure framework, enabling researchers, policymakers, and the public to examine reported emissions and furnace operating conditions. The incineration plants themselves are responsible for the authenticity, accuracy, completeness, and validity of their published automatic monitoring data.
Access the platform: https://ljgk.envsc.cn/
2. Historical development
1988–2000: Pilot development
China’s first modern MSW incineration plant was established in Shenzhen in 1988 using imported Japanese equipment. Development remained limited during this initial period, with fewer than ten facilities and total capacity below 10,000 tonnes per day by 2000.
2001–2010: Expansion and institutional development
The industry entered a period of expansion, with 85 new plants reported as entering operation and total capacity reaching approximately 83,000 tonnes per day. National standards, policy incentives and experience with imported technology helped establish the foundations for a domestic industry.
2011–2020: Accelerated infrastructure development
Successive Five-Year Plans placed greater emphasis on municipal waste treatment capacity and reducing reliance on landfilling, particularly in eastern cities and densely populated areas. Investment increased, the domestic supply chain expanded, and large grate-incineration facilities became increasingly common.
2021–2024: Consolidation and upgrading
The industry moved towards a mature nationwide infrastructure network. Priorities increasingly included operational efficiency, regional coordination, energy recovery, treatment of multiple waste streams, ash management, digitalization and lower-carbon operations.
The next phase
Future development will depend not only on additional capacity, but also on effective utilization of existing plants, waste prevention and segregation, transparent environmental monitoring, improved energy recovery and appropriate planning for regions with different waste volumes and financial resources.
3. Policy and legislative framework
China’s MSW incineration sector has developed under a combination of national waste-management legislation, Five-Year Plans, technical standards, environmental monitoring requirements and renewable electricity policies.
Important milestones:
- 2000 — Renewable electricity policy support: the Management Measures of Resource Utilization Power Plant (Unit) Recognition brought MSW incineration plants within the scope of government incentives.
- 2012 — National urban MSW treatment planning: the 12th Five-Year Plan for the Construction of National Urban MSW Treatment Facilities established targets for increasing incineration capacity.
- 2014 — Pollution-control standard: GB 18485-2014 established requirements for MSW incineration pollution control, including emission limits and monitoring.
- 2016–2017 — Planning and facility development: national measures encouraged stronger planning and site selection for incineration facilities and supported greater participation by market operators.
- 2020 — Solid-waste law revision and subsidy reform: the revised Law on the Prevention and Control of Environmental Pollution by Solid Wastes took effect, strengthening requirements for MSW segregation and management. Renewable electricity subsidy rules were also updated.
- 2021 — Mandatory engineering requirements: GB 55012-2021, Specifications for MSW Treatment and Disposal Projects, established requirements for the construction, operation and monitoring of waste-treatment facilities.
- 2024 — Engineering technology standard: GB/T 51452-2024, Standard for Engineering Technology of MSW Incineration and Energy Utilization, took effect in May 2024, according to the report.
The list provides a historical starting point, not an exhaustive statement of current law. The applicable versions, amendments, implementation dates and status of each instrument should be checked against official Chinese legal and standards databases before the page is published.
4. Technologies and energy recovery
5. Regional distribution and development challenges
Incineration facilities are distributed across mainland China’s provincial-level regions, with relatively high concentrations in populous and economically developed eastern provinces, including Guangdong, Jiangsu, Zhejiang and Shandong.
The industry faces several planning and operational challenges:
- Regional differences in waste generation and composition.
- Potential overcapacity or low utilization in some locations.
- Financial and operational constraints for smaller facilities in less densely populated areas.
- The need to maintain reliable emissions control and public transparency.
- Safe management and potential resource recovery from incineration residues.
- Improving energy efficiency and reducing greenhouse-gas emissions.
- Coordinating incineration with waste prevention, recycling, biological treatment and other waste-management options.
Infrastructure planning should therefore consider the entire waste-management system rather than incineration capacity in isolation.
6. International relevance
China’s experience offers a substantial body of evidence on the development, financing, construction and operation of large-scale MSW incineration infrastructure. Its domestic equipment supply chain, plant-scale optimization, energy-recovery technologies and digital operating systems are relevant to international research and technical cooperation.
However, the suitability of any WtE project depends on local waste composition, moisture content, calorific value, collection systems, environmental standards, financing, electricity and heat demand, and the availability of alternatives such as recycling and biological treatment.
The Chinese experience is therefore best understood as a set of technologies, operating practices and planning lessons that can be assessed and adapted to local conditions.
7. Data sources and further reading
Official statistical sources
- Ministry of Housing and Urban-Rural Development (MoHURD): urban and rural construction statistics.
- National Bureau of Statistics of China (NBS): China Statistical Yearbooks and national data.
- Ministry of Ecology and Environment (MEE): environmental regulation and the automatic monitoring platform for MSW incineration plants.
About this page
This country profile is maintained as part of the WtERT Global Waste-to-Energy Atlas. Statistics should be updated when new official datasets become available.
Figures from different sources may differ because of reporting dates, geographical coverage, definitions of facilities and differences between designed capacity and actual throughput.

Welcome to SOFOS: A Comprehensive Online Database
Managed by WtERT® and the Earth Engineering Center at Columbia University, SOFOS is a vast collection of research dedicated to the advancement of sustainable waste management that promotes knowledge sharing through numerous publications, dissertations, and studies.
Reinforce Your Knowledge by exploring our database. Enter your search inquiry below: